Ultra PS Board

Ultra PS Board


Negotiable Min Order Quantity Unit

Required Quantity
Place of Origin
Payment Terms
Negotiable
Production method
Negotiable
Shipping / Lead Time
Negotiable / Negotiable
Keyword
Category
Chopping Blocks
tK Meet
tK Meet

Apply a video call to the Supplier

SEND TO SUPPLIER INQUIRY

Country / Year Established
South Korea South Korea /
Business type
Others
Verified Certificate

16

DUNS

Product name Ultra PS Board Certification -
Category Chopping Blocks Ingredients -
Keyword - Unit Size -
Brand name - Unit Weigh -
origin Stock -
Supply type - HS code -

Product Information

Types and specifications of Ultra PS Board

NS-100
NS-200(R/P Type)
Thickness Weight Effective
Width
Total
Width
15
2.5
374
399
Thickness Weight Effective
Width
Total
Width
15
2.5
374
399

NS-200 (Siding Board Type)
NS-300(Siding Board Type)
Thickness Weight Effective
Width
Total
Width
15
2.5
345
382
Thickness Weight Effective
Width
Total
Width
15
2.4
315
355

How to apply ultra polyurethane siding board

  • Steel House

Comparison between other materials and polyurethane siding board installation (section)

  • Remodeling

Installation Process

  • Maintaining fixed intervals, (i.e. 500mm), fix studs(steel/wood) to the outer wall
  • Attach urethane siding boards on the studs

Subsidiary materials for ultra PS board (specification)

  • Detailed drawings of subsidiary materials

How to install the ultra PS board

For connection between ultra PS board and OSB board or girth. Use only self drilling screw, and be careful not to apply excessive force to avoid damaging uitra PS board

  • Base mould installation
    Mark the outer wall to which the siding board will be installed, with ink lines. Then install the base mould. Ensure the corner is attached tightly, by forming a 45 degree angle
  • In corner/ Out corner mould (cornermould) installation
    The corner mould is divided into internal and external parts. The in corner mould must be tightly fixed onto the wall. If the installation of the siding board is completed, connect the outer mould to the inner mould to complete installation
  • End mould installation
    Ensure the window frame or the door frame is completely perpendicular and flat. Then install the mould tightly by forming a 45 degree angle for the part where the corners meet
  • Joint mould installation
    • When connecting the siding board one after another, use in corner and out corner moulds to form the connections between the boards
    • To install the joint mould, mark the center with an inking line prior to installing the siding board. Fix the in corner mould tightly to the wall
    • Install the siding board, and connect the out corner mould to the in corner mould previously installed to complete installation

B2B Trade

Price (FOB) Negotiable transportation -
MOQ Negotiable Leadtime Negotiable
Payment Options Negotiable Shipping time Negotiable
Country / Year Established
South Korea South Korea /
Business type
Others

16

DUNS

President

Related Products

Other buyers also search

Membership Grade

BUYER

Biz Pro VIP

SELLER

Biz Pro VIP
팝업닫기
Live Chat A new message arrives
from a business partner.

No Data

  • There is no data to load
  • Check out the My tK > My Inquiries list.
  • After agreeing to the use of the Live Chat service, the list is printed only when there is at least one history of receiving or sending a Live Chat request.

If you have not yet agreed to use the Live Chat service,

You can use the Live Chat freely after agreeing to the use of the Live Chat service.

View more
View more